Reading & Berks County, PA · Se habla español
Home / Services / Drywall Finishing
Paint shows everything. We tape, coat and sand to the level your project calls for—most often Level 4, and Level 5 where gloss paint or critical lighting will expose every joint.
Scope
We check our work the way the owner will see it: with a work light held flat to the wall. Joints, corners and fasteners are feathered wide, sanded clean and touched up before we hand off to paint.
Joints, inside and outside corners, and fasteners.
Smooth surface for flat and eggshell paint.
Full skim for gloss paint and critical lighting.
Surfaces checked under raking light before we call it paint-ready.
Finish levels
Based on the industry's standard finish levels (GA-214). The right level depends on paint sheen and lighting.
Board only, or tape embedded with a single coat. Used where walls will be covered or hidden (above ceilings, mechanical rooms) or under tile.
An additional coat on joints and fasteners. Typical under heavy texture.
Three coats on joints and fasteners, sanded smooth. The standard for flat or eggshell paint in homes and most commercial spaces.
Level 4 plus a skim coat over the entire surface. Recommended for gloss or semi-gloss paint, long corridors, and walls hit by raking light from windows or wall-wash fixtures.
On the job
FAQ
Level 5 is the highest drywall finish. After a Level 4 finish, a thin skim coat is applied over the entire surface to even out texture and porosity. It's recommended for gloss paints and areas with strong side lighting.
Most painted walls with flat or eggshell paint are fine at Level 4. Choose Level 5 for glossy paint, long hallways, large open walls, or where windows and wall-wash lights rake across the surface.
Yes. We finish to the level called for in your plans or specs, and we'll flag areas where a higher level may be worth it before work starts.
Related services
Walls and ceilings hung tight with clean cuts—standard, fire-rated and moisture-resistant board.
View service →
Holes, cracks, water damage and punch-list repairs blended to disappear after paint.
View service →
Suspended grid and acoustical tile installed level and centered to the ceiling plan.
View service →Request a quote
Call, email or upload drawings and we'll schedule a walkthrough or plan review—usually within 1–2 business days. Se habla español.